News

Drilling underway for Blackthorn at Mumbwa, Zamibia

  •  6 August 2009
  • 0 comments
  • 4 views
Drilling underway for Blackthorn at Mumbwa, Zamibia

BLACKTHORN Resources has announced 8000 metres of cored drilling has been completed at their Mumbwa project in Zamibia.

A further 6400 metres of cored drilling is planned from an additional 8 targets at Mushingashi.

The drilling forms part of from the Phase 3B program, a 50/50 joint venture with BHP Billiton.

Blackthorn also reported three drilling rigs are currently operating at the Mushingashi anomaly there.

These holes are located according to a re-interpretation of earlier exploration data, and are designed to target possible Iron Oxide Copper-Gold style mineralisation for copper, gold and uranium.

Add a comment

| More

Add a comment Comments

No comments found, be the first to add one.
Thank you very much.

Your comment has been submitted.

Required

Please enter your name.

Required, but never displayed.

Please enter a valid email address.

Optional, and linked if provided.

Required

Please enter your comment.

Required

Please enter the code shown on the right.
Check this box to receive the latest updates in our email newsletter.
to get Drilling Exploration
delivered to your inbox

Recent comments

Latest from Twitter

    Getting your tweets...