News

Excalibur Mining to increase drilling at Tennant Creek Project, NT

  •  20 July 2009
  • 0 comments
  • 13 views
Excalibur Mining to increase drilling at Tennant Creek Project, NT

EXCALIBUR Mining Corporation has announced it will be increasing drilling at the Tennant Creek Project in the Northern Territory.

Excalibur said it intends to drill at the project over the next two months.

Three Reverse Circulation (RC) holes will be drilled at the Juno prospect to test limits of previous stoping, remnant mineralisation and the possibility of stope fill material.

The holes will be drilled from the surface to approximately 350 metres depth and will test mineralisation on both the north and south sided of the previous mining operation.

Drilling of the shallows resources at Rising Sun and Weaber’s Find are aimed at defining an open pittable JORC compliant resource.

At Nobles nob, some holes will be drilled deeper to test mineralisation located in an underground diamond drill hole drilled some years ago.

Add a comment

Add a comment Comments

No comments found, be the first to add one.
Thank you very much.

Your comment has been submitted.

Required

Please enter your name.

Required, but never displayed.

Please enter a valid email address.

Optional, and linked if provided.

Required

Please enter your comment.

Required

Please enter the code shown on the right.
Check this box to receive the latest updates in our email newsletter.
to get Drilling Exploration
delivered to your inbox

Recent comments

Latest from Twitter

    Getting your tweets...