EXCALIBUR Mining Corporation has announced it will be increasing drilling at the Tennant Creek Project in the Northern Territory.
Excalibur said it intends to drill at the project over the next two months.
Three Reverse Circulation (RC) holes will be drilled at the Juno prospect to test limits of previous stoping, remnant mineralisation and the possibility of stope fill material.
The holes will be drilled from the surface to approximately 350 metres depth and will test mineralisation on both the north and south sided of the previous mining operation.
Drilling of the shallows resources at Rising Sun and Weaber’s Find are aimed at defining an open pittable JORC compliant resource.
At Nobles nob, some holes will be drilled deeper to test mineralisation located in an underground diamond drill hole drilled some years ago.
Add a comment